March 27

At Stent Family Hall, work includes site grading and digging footings for the retaining wall as well as the metal decking installation and steel welding, which may be noisy. In the kitchen, ongoing work includes installation of metal stud framing, mechanical duct, electrical conduit, and plumbing and fire sprinkler pipe. The walk-in and walk-up refrigerators and freezers are also in place. At the Technology Center, structural steel mobilization will begin. Please note that the paths between the Dance Studio and the Stent Hall construction site as well as the area between College Counseling and the construction site will be closed until April 10.

 

March 20

This week, the metal decking installation and steel welding continue at Stent Family Hall. This may cause some noise disruption. In the Stent kitchen, work on the fire sprinkler pipe as well as the installation of the metal stud framing, mechanical duct, plumbing pipe, electrical conduit, and walk-in cooler are also ongoing. At the Technology Center, work continues on the structural steel connection to the Creative Arts and Design building. Please note that the paths between the Dance Studio and the Stent Hall construction site as well as the area between College Counseling and the construction site will be closed until April 10.

 

March 13

Last week, exciting progress was made on the dining hall and student center expansion with the arrival and installation of the structural steel. Work continues this week with the installation of metal decking and steel welding, which may be noisy. In the Stent kitchen, ongoing projects include fire sprinkler pipe work as well as the installation of metal stud framing, mechanical duct, plumbing pipe, and the electrical conduit. The work for the Technology Center includes the install of the edger angle at the top of the shotcrete walls. Installations for structural steel and metal decking will start later this week. Please note that the path between the Dance Studio and Stent Hall construction site as well as the area between College Counseling and the construction site will be closed until April 10th. 

 

March 6

The installation of the structural steel for the addition to Stent Family Hall begins this week. As such, the path between the Stent Hall Construction Site and the Dance Studio as well as the area between the Upper School and the Dance Studio will be closed to accommodate the crane starting TODAY, Monday, March 6, through Friday, March 10. The detour areas include around the B Building (through the exit near the Redwood Grove) and around the front of Stent Hall. There will also be heavy traffic through the rear entrance throughout the week as well.

Additionally, work on the kitchen inside Stent Hall is also ongoing, which includes work on the fire sprinkler pipe and installations for the metal stud framing, mechanical duct, plumbing pipe and electrical conduit. Work on the Technology Center also continues and includes the prepared scaffold, wires for shotcrete, shotcrete lower level vertical walls, and installation of the steel connection points at the Creative Arts and Design Building’s exterior walls and ledger angle at top of shotcrete walls.